Funding

AMATS receives over $9 million dollars a year to invest in the region’s transportation infrastructure. All funding is provided through the federal government by the federal gas tax which is paid when consumers purchase gasoline.

AMATS uses these funds to help communities pay for road maintenance, safety improvements, congestion relief and bike and pedestrian infrastructure.

Transportation Improvement Plan (TIP)

AMATS maintains a Transportation Improvement Program (TIP)  that includes all projects that use federal funds over a four year period.  The current TIP includes projects from Fiscal Year 2018 to 2021. (The fiscal year begins every year on July 1st and ends June 30.  For example, the 2018 Fiscal Year began in July of 2017).

PID #
Location

RIDESHARE

PID #: 100691

County:

PORTAGE,SUMMIT,CHIPPEWA TOWNSHIP

Location:

VARIOUS LOCATIONS

Description:

PROMOTION OF CARPOOLING

Project Sponsor:
Total Project Cost:

$250,000

Project Funding Details-
Phase:

P

Fund Type:

CMAQ-A

Amount:

$50,000
$60,000
$60,000
$80,000

Year:

2018
2019
2020
2021

AMATS AIR QUALITY ADVOCACY PROGRAM

PID #: 100692

County:

PORTAGE,SUMMIT,CHIPPEWA TOWNSHIP

Location:

VARIOUS LOCATIONS

Description:

PROMOTION OF ACTIVITIES TO IMPROVE AIR QUALITY SUCH AS BIKING AND WALKING

Project Sponsor:
Total Project Cost:

$395,000

Project Funding Details-
Phase:

P
P

Fund Type:

CMAQ-A
LOCAL

Amount:

$70,000
$70,000
$175,000
$80,000
$20,000
$96,000
$24,000

Year:

2018
2019
2019
2020
2020
2021
2021

CENTRAL INTERCHANGE

PID #: 101402

County:

SUMMIT

Location:

AKRON

Description:

RECONSTRUCT AND REALIGN THE WESTBOUND TO SOUTHBOUND RAMP,THE EASTBOUND TO NORTHBOUND RAMP AND THE WESTBOUND TO NORTHBOUND RAMP

Project Sponsor:
Total Project Cost:

$640,979,000

Project Funding Details-
Phase:

P
P
P
R
R
C
C

Fund Type:

NHPP
HSIP
STATE
HSIP
STATE
NHPP

Amount:

$3,120,000
$900,000
$4,467,000
$900,000
$100,000
$42,525,000
$4,725,000

Year:

2018
2018
2018
2019
2019
2021
2021

SR 14

PID #: 102234

County:

PORTAGE

Location:

STREETSBORO

Description:

TWO WAY LEFT TURN LANE,SIDEWALK FROM PORTAGE POINT DR TO DIAGONAL RD

Project Sponsor:
Total Project Cost:

$7,772,400

Project Funding Details-
Phase:

P
P
R
R
C
C
C

Fund Type:

HSIP
LOCAL
HSIP
LOCAL
STBG-A
HSIP
LOCAL

Amount:

$59,000
$6,600
$156,600
$17,400
$2,651,000
$2,366,000
$925,600

Year:

2018
2018
2020
2020
2021
2021
2021

I77 (SOUTH LEG) AND I76/I77 (WEST LEG)

PID #: 102329

County:

SUMMIT

Location:

AKRON

Description:

PAVEMENT REPLACEMENT INCLUDING WORK TO BRIDGES FROM WATERLOO TO VERNON ODEM

Project Sponsor:
Total Project Cost:

$97,000,000

Project Funding Details-
Phase:

P
P
C
C

Fund Type:

FED
STATE
FED
STATE

Amount:

$1,800,000
$200,000
$85,500,000
$9,500,000

Year:

2019
2019
2021
2021

TALLMADGE AVE/INDEPENDENCE AVE

PID #: 102625

County:

SUMMIT

Location:

AKRON

Description:

NEW SIDEWALK FROM TALLMADE AVE TO INDEPENDENCE AVE

Project Sponsor:
Total Project Cost:

$1,967,000

Project Funding Details-
Phase:

C
C

Fund Type:

TAP-A
LOCAL

Amount:

$137,000
$342,000

Year:

2018
2018

SR 91/SR 303

PID #: 102692

County:

SUMMIT

Location:

HUDSON

Description:

TURN LANES,INTERSECTION IMPROVEMENTS,SIDEWALKS AT INTERSECTION

Project Sponsor:
Total Project Cost:

$24,005,000

Project Funding Details-
Phase:

R
R
C
C
C

Fund Type:

STBG-A
LOCAL
STBG-A
LOCAL

Amount:

$80,000
$20,000
$1,792,000
$448,000

Year:

2020
2020
2021
2021

E EXCHANGE ST

PID #: 102701

County:

SUMMIT

Location:

AKRON

Description:

SIGNAL COORDINATION,BIKE LANES OR MULTI-USE PATH,PEDESTRIAN IMPROVEMENTS FROM BROADWAY ST TO FOUNTAIN ST

Project Sponsor:
Total Project Cost:

$5,043,000

Project Funding Details-
Phase:

R
R

Fund Type:

STBG-A
LOCAL

Amount:

$240,000
$60,000

Year:

2021
2021

FREEDOM TRAIL/PORTAGE HIKE AND BIKE CONNECTOR

PID #: 102796

County:

SUMMIT

Location:

STOW
TALLMADGE
KENT

Description:

ASPHALT TRAIL FROM FREEDOM TRAIL TO PORTAGE HIKE AND BIKE TRAIL

Project Sponsor:
Total Project Cost:

$2,726,400

Project Funding Details-
Phase:

R

Fund Type:

LOCAL

Amount:

$850,000

Year:

2019

STEELS CORNERS RD

PID #: 102904

County:

SUMMIT

Location:

CUYAHOGA FALLS

Description:

RESURFACING FROM NORTHAMPTON RD TO STATE RD

Project Sponsor:
Total Project Cost:

$8,907,000

Project Funding Details-
Phase:

C
C

Fund Type:

STBG-A
LOCAL

Amount:

$700,000
$175,000

Year:

2021
2021

CENTER RD

PID #: 102906

County:

SUMMIT

Location:

NEW FRANKLIN

Description:

RESURFACING FROM CLEVELAND MASSILLON RD TO EASTVIEW DR

Project Sponsor:
Total Project Cost:

$12,153,000

Project Funding Details-
Phase:

C
C

Fund Type:

STBG-A
LOCAL

Amount:

$800,000
$3,938,000

Year:

2018
2018

SR 8

PID #: 103028

County:

SUMMIT

Location:

BATH TOWNSHIP

Description:

8′ WIDE SIDEWALK FROM HOLIDAY INN TO CLEVELAND MASSILLON RD

Project Sponsor:
Total Project Cost:

$543,000

Project Funding Details-
Phase:

P
P
R
R
C
C

Fund Type:

TAP-A
LOCAL
TAP-A
LOCAL
TAP-A
LOCAL

Amount:

$879,000
$219,000
$8,000
$2,000
$3,212,000
$803,000

Year:

2020
2020
2021
2021
2021
2021

MEDINA LINE RD

PID #: 103085

County:

SUMMIT

Location:

BATH TOWNSHIP

Description:

RESURFACING FROM SR 18 TO GRANGER RD

Project Sponsor:
Total Project Cost:

$9,462,000

Project Funding Details-
Phase:

C
C

Fund Type:

STBG-A
LOCAL

Amount:

$7,436,000
$1,859,000

Year:

2019
2019

SR 162

PID #: 103171

County:

SUMMIT

Location:

COPLEY TWP

Description:

EB LEFT TURN LANE, SB RIGHT TURN LANE ON SR162 AT COPLEY CIRCLE

Project Sponsor:
Total Project Cost:

$1,075,000

Project Funding Details-
Phase:

C
C
C
C

Fund Type:

DISC
CMAQ
STATE
LOCAL

Amount:

$460,000
$400,000
$115,000
$100,000

Year:

2019
2019
2019
2019

SR 162

PID #: 103171

County:

SUMMIT

Location:

COPLEY TOWNSHIP

Description:

NEW EASTBOUND LEFT TURN LANE, NEW SOUTHBOUND RIGHT TURN LANE AT CLEVELAND MASSILLON RD

Project Sponsor:
Total Project Cost:

$18,213,000

Project Funding Details-
Phase:

C

Fund Type:

LOCAL

Amount:

$1,500,000

Year:

2020

SR 241

PID #: 103172

County:

SUMMIT

Location:

GREEN

Description:

ROUNDABOUT AT SR 241 AND CORPORATE WOODS CIRCLE

Project Sponsor:
Total Project Cost:

$17,479,000

Project Funding Details-
Phase:

R
R

Fund Type:

STBG-A
LOCAL

Amount:

$13,983,000
$3,496,000

Year:

2021
2021

SR 241/BOETTLER/FRANK

PID #: 103173

County:

SUMMIT

Location:

GREEN

Description:

ROUNDABOUT SR 241 AND BOETTLER RD/FRANKS PKWY

Project Sponsor:
Total Project Cost:

$5,566,000

Project Funding Details-
Phase:

P
P
R
R
C
C

Fund Type:

CMAQ
LOCAL
CMAQ
LOCAL
CMAQ
LOCAL

Amount:

$4,313,000
$2,876,000
$4,455,000
$297,000
$23,963,000
$15,975,000

Year:

2019
2019
2020
2020
2021
2021

CLEVELAND MASSILLON RD

PID #: 103293

County:

SUMMIT

Location:

FAIRLAWN

Description:

WIDEN TO FIVE LANES,ROUNDABOUT,SIGNAL RECONSTRUCT AT ELGIN,MULTI-USE PATH FROM I-77 TO NORTH OF BYWOOD AVE

Project Sponsor:
Total Project Cost:

$75,642,000

Project Funding Details-
Phase:

R
R
R
R
C
C
C
C

Fund Type:

CMAQ
LOCAL
HSIP
LOCAL
CMAQ
LOCAL
HSIP
LOCAL

Amount:

$120,000
$30,000
$1,800,000
$200,000
$13,272,000
$3,318,000
$30,000,000
$3,333,000

Year:

2019
2019
2020
2020
2020
2020
2021
2021

PORTAGE LAKES DR

PID #: 103818

County:

SUMMIT

Location:

COVENTRY TOWNSHIP

Description:

RESURFACING FROM SR 93 TO CORMANY RD

Project Sponsor:
Total Project Cost:

$2,051,000

Project Funding Details-
Phase:

C
C

Fund Type:

STBG-A
LOCAL

Amount:

$1,612,000
$403,000

Year:

2020
2020

CENTER RD

PID #: 103833

County:

SUMMIT

Location:

NEW FRANKLIN

Description:

RESURFACING FROM EASTVIEW DR TO S. MAIN ST

Project Sponsor:
Total Project Cost:

$12,158,000

Project Funding Details-
Phase:

C
C

Fund Type:

STBG-A
LOCAL

Amount:

$800,000
$3,943,000

Year:

2018
2018

PORTAGE HIKE & BIKE

PID #: 103834

County:

PORTAGE

Location:

KENT

Description:

TRAIL ALONG WEST BANK OF CUYAHOGA RIVER,STAIRWAY ON BRADY’S LEAP SEGMENT FROM W MAIN ST TO FAIRCHILD AVE

Project Sponsor:
Total Project Cost:

$1,305,600

Project Funding Details-
Phase:

C
C

Fund Type:

TAP-A
LOCAL

Amount:

$700,000
$538,700

Year:

2021
2021

MAIN ST

PID #: 104042

County:

SUMMIT

Location:

AKRON

Description:

STREET AND SIDEWALK REPLACEMENT,DEDICATED BIKE LANES,ROUNDABOUT,GREEN INFRASTRUCTURE BETWEEN STATE ST AND MILL ST

Project Sponsor:
Total Project Cost:

$20,914,700

Project Funding Details-
Phase:

C
C
C
C

Fund Type:

DISC
LMBR
STBG
LOCAL

Amount:

$5,000,000
$7,500,000
$770,700
$7,644,000

Year:

2020
2020
2020
2020

CLEVELAND MASSILLON RD

PID #: 104582

County:

SUMMIT

Location:

BARBERTON

Description:

RESURFACING,MINOR INTERSECTION IMPROVEMENTS FROM SOUTH CORP LINE TO 31ST ST WOOSTER RD AND HOPOCAN AVE

Project Sponsor:
Total Project Cost:

$2,853,000

Project Funding Details-
Phase:

C
C
C

Fund Type:

STBG-A
HSIP
LOCAL

Amount:

$1,613,000
$76,000
$403,000

Year:

2018
2018
2018

I77/US224/I277

PID #: 106002

County:

SUMMIT

Location:

AKRON/COVENTRY TWP

Description:

ADD LANES ON I77 FROM ARLINGTON TO I277/US224, WIDEN RAMP TO TWO LANES FROM I77 NB TO I277/US224 WB

Project Sponsor:
Total Project Cost:

$5,005,000

Project Funding Details-
Phase:

P
P
P
P
P
P

Fund Type:

TRAC
STATE
TRAC
STATE
TRAC
STATE

Amount:

$1,800,000
$200,000
$1,800,000
$200,000
$900,000
$100,000

Year:

2018
2018
2019
2019
2020
2020

SR 43

PID #: 106416

County:

PORTAGE

Location:

STREETSBORO

Description:

WIDEN SR 43 TO ACCOMMODATE TWO LEFT TURN LANES, ADD A SOUTH BOUND TRAVEL LANE BETWEEN EVERGREEN AND I-80

Project Sponsor:
Total Project Cost:

$2,555,600

Project Funding Details-
Phase:

P
P

Fund Type:

HSIP
LOCAL

Amount:

$542,900
$60,300

Year:

2018
2018

RAVENNA RD

PID #: 107603

County:

SUMMIT

Location:

TWINSBURG

Description:

RESURFACING FROM EAST IDLEWOOD DR TO RICHTER CT

Project Sponsor:
Total Project Cost:

$785,000

Project Funding Details-
Phase:

C
C

Fund Type:

STBG
LOCAL

Amount:

$628,000
$157,000

Year:

2018
2018

INFIRMARY RD

PID #: 107679

County:

PORTAGE

Location:

SHALERSVILLE TWP/RAVENNA TWP

Description:

RESURFACING FROM SR14 TO SR303

Project Sponsor:
Total Project Cost:

$804,700

Project Funding Details-
Phase:

C
C

Fund Type:

STBG
LOCAL

Amount:

$643,700
$160,900

Year:

2019
2019

SR 8

PID #: 76721

County:

SUMMIT

Location:

STOW/HUDSON

Description:

TOTAL PAVEMENT REPLACEMENT FROM GRAHAM RD TO NORTH OF SR 303

Project Sponsor:
Total Project Cost:

$57,602,000

Project Funding Details-
Phase:

C
C
C
C
C

Fund Type:

GARVEE
BR
MLMR
STATE
LOCAL

Amount:

$55,000,000
$80,000
$16,000
$2,485,000
$21,000

Year:

2019
2019
2019
2019
2019

EVANS AVE

PID #: 80684

County:

SUMMIT

Location:

AKRON

Description:

REALIGN EVANS AVE, CONSTRUCT BRIDGE OVER RR TRACKS

Project Sponsor:
Total Project Cost:

$9,376,100

Project Funding Details-
Phase:

C
C

Fund Type:

DISC
LOCAL

Amount:

$5,715,600
$2,990,900

Year:

2018
2018

SR 261

PID #: 88556

County:

SUMMIT

Location:

AKRON

Description:

RECONSTRUCT AND REDUCE TO THREE STANDARD LANES,REALIGN DAYTON ST INTERSECTION,UPGRADE TRAFFIC SIGNALS,UPGRADE SIDEWALK FROM N. MAIN ST TO GORGE BLVD

Project Sponsor:
Total Project Cost:

$34,824,000

Project Funding Details-
Phase:

C
C

Fund Type:

STBG-A
LOCAL

Amount:

$2,436,000
$609,000

Year:

2019
2019

CANTON RD/SR 91

PID #: 89113

County:

SUMMIT

Location:

SPRINGFIELD TOWNSHIP
VILLAGE OF LAKEMORE

Description:

STANDARD LANE WIDTH,ADD CONCRETE MEDIAN,TURN LANES,NEW SIDEWALKS FROM SPRINGFIELD LAKE DR TO FARMDALE RD

Project Sponsor:
Total Project Cost:

$10,490,000

Project Funding Details-
Phase:

P
P
C
C
C
C

Fund Type:

HSIP
STATE
STBG-A
HSIP
STATE
LOCAL

Amount:

$1,283,000
$142,000
$31,495,000
$25,712,000
$5,495,000
$10,115,000

Year:

2018
2018
2019
2019
2019
2019

SR 241

PID #: 90415

County:

SUMMIT

Location:

GREEN

Description:

WIDEN TO FIVE LANES, BIKE LANES, NEW SIDEWALKS

Project Sponsor:
Total Project Cost:

$144,678,000

Project Funding Details-
Phase:

R
R
C
C
C

Fund Type:

STBG-A
LOCAL
STBG-A
HSIP
LOCAL

Amount:

$1,600,000
$400,000
$3,520,000
$2,000,000
$3,880,000

Year:

2018
2018
2020
2020
2020

SR 59

PID #: 91071

County:

SUMMIT

Location:

AKRON

Description:

BRIDGE MAINTENANCE OVER I-76

Project Sponsor:
Total Project Cost:

$3,965,000

Project Funding Details-
Phase:

C
C

Fund Type:

NHPP
STATE

Amount:

$3,218,000
$358,000

Year:

2019
2019

SR 8

PID #: 91710

County:

SUMMIT

Location:

AKRON

Description:

BRIDGE REPLACEMENT OVER CUYAHOGA RIVER VALLEY

Project Sponsor:
Total Project Cost:

$1,425,516,000

Project Funding Details-
Phase:

P
P
P
P
R
R
C
C

Fund Type:

NHPP
STATE
NHPP
STATE
NHPP
STATE
NHPP
STATE

Amount:

$38,938,000
$9,734,000
$200,000
$500,000
$1,100,000
$275,000

Year:

2018
2018
2019
2019
2019
2019

SR 91

PID #: 92032

County:

SUMMIT

Location:

TWINSBURG

Description:

WIDEN TO FOUR LANES, INTERSECTION IMPROVEMENTS,NEW SIDEWALK FROM GLENWOOD TO NORTH CORP LINE

Project Sponsor:
Total Project Cost:

$49,696,000

Project Funding Details-
Phase:

C
C

Fund Type:

STBG-A
LOCAL

Amount:

$3,344,000
$836,000

Year:

2019
2019

CANTON RD/E MARKET ST

PID #: 93433

County:

SUMMIT

Location:

AKRON

Description:

INTERSECTION REALIGNMENT, ROAD DIET, POSSIBLE ROUNDABOUT AT INTERSECTION

Project Sponsor:
Total Project Cost:

$4,402,700

Project Funding Details-
Phase:

P
P
C
C
C
C

Fund Type:

HISP
LOCAL
CMAQ-A
LOCAL
HSIP
LOCAL

Amount:

$100,000
$111,000
$800,000
$200,000
$20,000,000
$2,222,000

Year:

2018
2018
2019
2019
2020
2020

SR 43/S WATER ST

PID #: 93442

County:

PORTAGE

Location:

KENT

Description:

TURN LANES, SIGNAL UPGRADE, SIGNAL INTERCONNECT,SIDEWALK RAMPS FROM SR 261 TO SUMMIT ST

Project Sponsor:
Total Project Cost:

$3,072,100

Project Funding Details-
Phase:

C
C

Fund Type:

CMAQ-A
LOCAL

Amount:

$2,240,000
$560,000

Year:

2018
2018

HOWE AVE

PID #: 93819

County:

SUMMIT

Location:

CUYAHOGA FALLS

Description:

RECONSTRUCTION FROM MAIN ST TO BUCHHOLZER BLVD

Project Sponsor:
Total Project Cost:

$7,172,000

Project Funding Details-
Phase:

R
R
P
P
C
C

Fund Type:

STBG-A
LOCAL
STBG-A
LOCAL
STBG-A
LOCAL

Amount:

$440,000
$11,000
$40,000
$10,000
$5,044,000
$1,342,000

Year:

2018
2018
2019
2019
2019
2019

SR 91

PID #: 93822

County:

SUMMIT

Location:

HUDSON

Description:

TURN LANES,SIDEWALKS FROM TURNPIKE BRIDGE TO MIDDLETON RD

Project Sponsor:
Total Project Cost:

$3,814,000

Project Funding Details-
Phase:

C
C

Fund Type:

STBG-A
LOCAL

Amount:

$2,800,000
$700,000

Year:

2020
2020

SR 303

PID #: 93854

County:

PORTAGE

Location:

STREETSBORO

Description:

REPLACE CULVERT,ADJUST ROADWAY PROFILE TO IMPROVE DRAINAGE FROM WEST OF W&LE RR TRACKS TO JUST EAST OF SR 303 BYPASS RD

Project Sponsor:
Total Project Cost:

$33,388,000

Project Funding Details-
Phase:

C
C
C
C

Fund Type:

STBA-A
STBG
STATE
LOCAL

Amount:

$1,080,000
$1,100,000
$235,000
$310,000

Year:

2018
2018
2018
2018

SR700

PID #: 94131

County:

PORTAGE

Location:

HIRAM/HIRAM TWP

Description:

RESURFACING, BRIDGE MAINTENANCE FROM SR88 TO GEAUGA CO LINE

Project Sponsor:
Total Project Cost:

$1,365,500

Project Funding Details-
Phase:

C
C
C
C

Fund Type:

STBG-A
STBG
STATE
LOCAL

Amount:

$10,700
$1,021,700
$255,200
$2,900

Year:

2018
2018
2018
2018

I-76

PID #: 96670

County:

SUMMIT

Location:

AKRON/BARBERTON

Description:

RECONSTRUCTION OF I-76/WOOSTER RD/EAST AVE INTERCHANGE,EXTENSIVE RAMP REALIGNMENTS FROM CENTRAL AVE TO 27TH ST

Project Sponsor:
Total Project Cost:

$272,241,000

Project Funding Details-
Phase:

C
C
C
C

Fund Type:

GARVEE
NHPP
STATE
LOCAL

Amount:

$22,500,000
$3,150,000
$650,000
$550,000

Year:

2019
2019
2019
2019

CLEVELAND MASSILLON RD

PID #: 97638

County:

SUMMIT

Location:

NORTON

Description:

MEDIAN TURN LANE,INTERSECTION WIDENING,SIGNAL UPGRADE,RESURFACING FROM WEBER DR TO PLEASANT DR

Project Sponsor:
Total Project Cost:

$60,865,000

Project Funding Details-
Phase:

C
C
C

Fund Type:

STBG-A
HSIP
LOCAL

Amount:

$3,368,000
$236,000
$901,000

Year:

2019
2019
2019

RIDESHARE

PID #: 97829

County:

PORTAGE,SUMMIT,CHIPPEWA TOWNSHIP

Location:

VARIOUS LOCATIONS

Description:

PROMOTION OF CARPOOLING

Project Sponsor:
Total Project Cost:

$250,000

Project Funding Details-
Phase:

P

Fund Type:

CMAQ-A

Amount:

$50,000
$60,000
$60,000
$80,000

Year:

2018
2019
2020
2021

RIDESHARE

PID #: 97830

County:

PORTAGE,SUMMIT,CHIPPEWA TOWNSHIP

Location:

VARIOUS LOCATIONS

Description:

PROMOTION OF CARPOOLING

Project Sponsor:
Total Project Cost:

$250,000

Project Funding Details-
Phase:

P

Fund Type:

CMAQ-A

Amount:

$50,000
$60,000
$60,000
$80,000

Year:

2018
2019
2020
2021

RIDESHARE

PID #: 97831

County:

PORTAGE,SUMMIT,CHIPPEWA TOWNSHIP

Location:

VARIOUS LOCATIONS

Description:

PROMOTION OF CARPOOLING

Project Sponsor:
Total Project Cost:

$250,000

Project Funding Details-
Phase:

P

Fund Type:

CMAQ-A

Amount:

$50,000
$60,000
$60,000
$80,000

Year:

2018
2019
2020
2021

AMATS AIR QUALITY ADVOCACY PROGRAM

PID #: 97832

County:

PORTAGE,SUMMIT,CHIPPEWA TOWNSHIP

Location:

VARIOUS LOCATIONS

Description:

PROMOTION OF ACTIVITIES TO IMPROVE AIR QUALITY SUCH AS BIKING AND WALKING

Project Sponsor:
Total Project Cost:

$395,000

Project Funding Details-
Phase:

P
P

Fund Type:

CMAQ-A
LOCAL

Amount:

$70,000
$70,000
$175,000
$80,000
$20,000
$96,000
$24,000

Year:

2018
2019
2019
2020
2020
2021
2021

AMATS AIR QUALITY ADVOCACY PROGRAM

PID #: 97833

County:

PORTAGE,SUMMIT,CHIPPEWA TOWNSHIP

Location:

VARIOUS LOCATIONS

Description:

PROMOTION OF ACTIVITIES TO IMPROVE AIR QUALITY SUCH AS BIKING AND WALKING

Project Sponsor:
Total Project Cost:

$395,000

Project Funding Details-
Phase:

P
P

Fund Type:

CMAQ-A
LOCAL

Amount:

$70,000
$70,000
$175,000
$80,000
$20,000
$96,000
$24,000

Year:

2018
2019
2019
2020
2020
2021
2021

AMATS AIR QUALITY ADVOCACY PROGRAM

PID #: 97834

County:

PORTAGE,SUMMIT,CHIPPEWA TOWNSHIP

Location:

VARIOUS LOCATIONS

Description:

PROMOTION OF ACTIVITIES TO IMPROVE AIR QUALITY SUCH AS BIKING AND WALKING

Project Sponsor:
Total Project Cost:

$395,000

Project Funding Details-
Phase:

P
P

Fund Type:

CMAQ-A
LOCAL

Amount:

$70,000
$70,000
$175,000
$80,000
$20,000
$96,000
$24,000

Year:

2018
2019
2019
2020
2020
2021
2021

VETERANS TRAIL

PID #: 97856

County:

SUMMIT

Location:

HUDSON

Description:

MULTI-PURPOSE TRAIL FROM BARLOW RD TO VETERANS WAY PARK

Project Sponsor:
Total Project Cost:

$14,183,000

Project Funding Details-
Phase:

C
C

Fund Type:

TAP-A
LOCAL

Amount:

$500,000
$580,000

Year:

2020
2020

CR 18/TALLMADGE RD

PID #: 98585

County:

PORTAGE

Location:

BRIMFIELD TOWNSHIP

Description:

INTERCHANGE IMPROVEMENTS AT MOGADORE RD AND 1-76

Project Sponsor:
Total Project Cost:

$9,921,900

Project Funding Details-
Phase:

R
R
C
C
C

Fund Type:

CMAQ-A
LOCAL
CMAQ-A
HSIP
LOCAL

Amount:

$500,000
$125,000
$3,160,000
$2,500,000
$1,415,000

Year:

2019
2019
2021
2021
2021

OLDE EIGHT RD

PID #: 98702

County:

SUMMIT

Location:

BOSTON HEIGHTS

Description:

RESURFACING FROM BOSTON MILLS RD TO NORTH CORP LINE

Project Sponsor:
Total Project Cost:

$9,382,000

Project Funding Details-
Phase:

C
C

Fund Type:

STBG-A
LOCAL

Amount:

$730,800
$1,644,000

Year:

2018
2018

OLDE EIGHT RD

PID #: 98703

County:

SUMMIT

Location:

BOSTON HEIGHTS

Description:

RESURFACING FROM SR 303 TO BOSTON MILLS RD

Project Sponsor:
Total Project Cost:

$10,352,000

Project Funding Details-
Phase:

C
C

Fund Type:

STBG-A
LOCAL

Amount:

$8,064,000
$2,016,000

Year:

2018
2018

CANTON RD

PID #: 99721

County:

SUMMIT

Location:

SPRINGFIELD TOWNSHIP

Description:

NEW SIDEWALK FROM TALLMADE AVE TO INDEPENDENCE AVE

Project Sponsor:
Total Project Cost:

$3,951,000

Project Funding Details-
Phase:

C
C

Fund Type:

TAP-A
LOCAL

Amount:

$224,000
$56,000

Year:

2020
2020

CANTON RD

PID #: 99725

County:

SUMMIT

Location:

SPRINGFIELD TOWNSHIP

Description:

RESURFACING FROM SALMON DR TO JUST SOUTH OF SPRINGFIELD LAKE DR

Project Sponsor:
Total Project Cost:

$1,018,000

Project Funding Details-
Phase:

C
C

Fund Type:

STBG-A
LOCAL

Amount:

$800,000
$200,000

Year:

2020
2020

MOORE RD

PID #: 99728

County:

SUMMIT

Location:

GREEN

Description:

NEW SIDEWALKS FROM ARLINGTON RD TO CHARLESTON DR

Project Sponsor:
Total Project Cost:

$1,581,000

Project Funding Details-
Phase:

C
C

Fund Type:

TAP
LOCAL

Amount:

$50,000
$1,000,000

Year:

2020
2020

RABER RD

PID #: 99729

County:

SUMMIT

Location:

GREEN

Description:

NEW SIDEWALKS FROM TROON DR TO MAYFAIR RD

Project Sponsor:
Total Project Cost:

$13,965,000

Project Funding Details-
Phase:

C
C

Fund Type:

TAP
LOCAL

Amount:

$500,000
$825,000

Year:

2020
2020

VARIOUS LOCATIONS

PID #: 99879

County:

PORTAGE

Location:

STREETSBORO

Description:

FIBER INTERCONNECTION,UPGRADE CENTRAL CONTROL,EQUIPMENT,EMERGENCY PREEMPTION AT VARIOUS LOCATIONS

Project Sponsor:
Total Project Cost:

$7,494,900

Project Funding Details-
Phase:

P
P
R
R
C
C
C
C

Fund Type:

CMAQ
LOCAL
CMAQ
LOCAL
CMAQ
LOCAL
HSIP
LOCAL

Amount:

$312,000
$78,000
$118,000
$29,500
$2,596,000
$1,724,000
$659,700
$73,200

Year:

2018
2018
2019
2019
2019
2019
2019
2019