Funding

AMATS receives over $15 million dollars a year to invest in the region’s transportation infrastructure. All funding is provided through the federal government by the federal gas tax which is paid when consumers purchase gasoline. This table provides an overview of the funding programs that AMATS helps to administer. AMATS uses these funds to help communities pay for road maintenance, safety improvements, congestion relief and bike and pedestrian infrastructure.

Transportation Improvement Program FY 2024-2027

AMATS 2023 Funding Policy Guidelines – Final

Additional Information Sheet

Sample RESOLUTION

Transportation Improvement Plan (TIP)

AMATS maintains a Transportation Improvement Program (TIP) that includes all projects that use federal funds over a four year period.  The current TIP includes projects from Fiscal Year 2024 to 2027. (The fiscal year begins every year on July 1st and ends June 30.  For example, the 2024 Fiscal Year began in July of 2023).

Rounds of funding are held every other year, with the next round scheduled for fall of 2023.

PID #
Location

IR 76

PID #: 100713

County:

SUMMIT

Location:

AKRON

Description:

IMPROVEMENTS TO INCREASE CAPACITY AND IMPROVE SAFETY INCLUDING STRUCTURAL REHABILITATION AND NOISE WALLS ON THE KENMORE LEG

Project Sponsor:
Total Project Cost:

$140,783,521

Project Funding Details-
Phase:

P
P
R
R

Fund Type:

FED
STATE
FED
STATE

Amount:

$1,223,312
$135,924
$45,000
$5,000

Year:

2025
2025
2025
2025

SR 21

PID #: 101439

County:

WAYNE

Location:

CHIPPEWA TWP

Description:

RESURFACING, BRIDGE MAINTENANCE, DRAINAGE & CULVERT REPLACEMENT, AND SAFETY IMPROVEMENTS AT CLINTON RD, EDWARDS RD, AND GRILL RD FROM SUMMIT COUNTY LINE TO NORTH OF WAYNE COUNTY LINE

Project Sponsor:
Total Project Cost:

$40,796,386

Project Funding Details-
Phase:

P
P
P
P
C
C
C
C
C
C

Fund Type:

FED
STATE
SAFETY-F
SAFETY-S
FED
STATE
SAFETY-F
SAFETY-S
FED
STATE

Amount:

$1,872,000
$468,000
$208,000
$52,000
$26,788,331
$6,713,138
$3,316,180
$345,785
$400,000
$100,000

Year:

2024
2024
2024
2024
2024
2024
2024
2024
2025
2025

IR76/IR77/SR8

PID #: 102329

County:

SUMMIT

Location:

AKRON

Description:

RESURFACING ON IR 76 AND IR 77, RECONSTRUCT LEFT EXIT RAMPS AT THE CENTRAL INTERCHANGE

Project Sponsor:
Total Project Cost:

$169,097,164

Project Funding Details-
Phase:

O
O
O
O

Fund Type:

GARVEE
GARVEE
GARVEE
GARVEE

Amount:

$7,285,182
$6,058,791
$6,058,791
$6,058,791

Year:

2024
2025
2026
2027

SR 91

PID #: 102745

County:

SUMMIT

Location:

STOW

Description:

RECONSTRUCTION, CURB RAMPS, SIDEWALKS, STORM SEWER, AND SIGNALS FROM SOUTH CORP LIMIT TO SOUTH OF NORTON AVE

Project Sponsor:
Total Project Cost:

$9,974,063

Project Funding Details-
Phase:

R
R
R
C
C
C
C
C
C

Fund Type:

STBG
TASA
LOCAL
STBG
CMAQ
TASA
FED
STATE
LOCAL

Amount:

$160,000
$140,000
$75,000
$4,500,000
$1,197,690
$560,000
$1,473,560
$93,703
$1,714,110

Year:

2024
2024
2024
2025
2025
2025
2025
2025
2025

FREEDOM TRAIL MIDDLEBURY CONNECTOR

PID #: 102796

County:

SUMMIT

Location:

TALLMADGE/STOW/KENT

Description:

CONSTRUCT MULTI-USE TRAIL FROM PORTAGE HIKE AND BIKE TO FREEDOM TRAIL

Project Sponsor:
Total Project Cost:

$3,593,346

Project Funding Details-
Phase:

C
C

Fund Type:

TASA
LOCAL

Amount:

$700,000
$1,641,216

Year:

2024
2024

SR 14/SR 43 INTERSECTION, SR 14/SR 303/RANCH RD

PID #: 105213

County:

PORTAGE

Location:

STREETSBORO

Description:

RESURFACING AND RECONSTRUCTION OF SR 14/SR 43 INTERSECTION, NEW SIGNAL, REMOVE WESTBOUND SLIP RAMP OF SR 14/SR 303/ RANCH RD INTERSECTION

Project Sponsor:
Total Project Cost:

$3,911,989

Project Funding Details-
Phase:

C
C
C
C
C

Fund Type:

STBG
CMAQ
FED
STATE
LOCAL

Amount:

$1,089,752
$459,517
$1,317,813
$1,080
$943,826

Year:

2026
2026
2026
2026
2026

RAVENNA RD BRIDGE

PID #: 105556

County:

PORTAGE

Location:

FRANKLIN TWP

Description:

REPLACE BRIDGE AND ADD LANES FOR PORTAGE HIKE AND BIKE TRAIL

Project Sponsor:
Total Project Cost:

$2,384,099

Project Funding Details-
Phase:

C
C
C

Fund Type:

TASA
FED
LOCAL

Amount:

$313,600
$1,317,000
$529,400

Year:

2024
2024
2024

FREEDOM TRAIL PHASE 4

PID #: 107930

County:

SUMMIT

Location:

AKRON

Description:

CONSTRUCT MULTI-USE TRAIL FROM MILL ST TO ROSA PARKS BLVD

Project Sponsor:
Total Project Cost:

$3,849,611

Project Funding Details-
Phase:

C
C

Fund Type:

TASA
LOCAL

Amount:

$700,000
$3,000,971

Year:

2025
2025

WOOSTER RD WEST

PID #: 108240

County:

SUMMIT

Location:

BARBERTON

Description:

RESURFACING AND RECONSTRUCTION WITH POSSIBLE ROAD DIET FROM 31ST ST TO HUDSON RUN RD, HUDSON RUN RD TO 2ND ST NW

Project Sponsor:
Total Project Cost:

$11,471,016

Project Funding Details-
Phase:

C
C
C
C

Fund Type:

STBG
SAFETY-F
SAFETY-S
LOCAL

Amount:

$6,000,000
$1,171,559
$130,173
$2,879,712

Year:

2024
2024
2024
2024

SR 59

PID #: 110743

County:

SUMMIT

Location:

CUYAHOGA FALLS/SILVER LAKE/STOW

Description:

RESURFACING FROM SR 8 TO PORTAGE COUNTY LINE

Project Sponsor:
Total Project Cost:

$3,014,100

Project Funding Details-
Phase:

C
C
C
C

Fund Type:

FED
STBG
STATE
LOCAL

Amount:

$2,273,680
$150,000
$73,720
$492,700

Year:

2024
2024
2024
2024

IR 77

PID #: 111404

County:

SUMMIT

Location:

BATH TWP

Description:

WIDEN TO 6 LANES FROM GHENT RD TO EVERETT RD

Project Sponsor:
Total Project Cost:

$62,835,448

Project Funding Details-
Phase:

C
C

Fund Type:

FED
STATE

Amount:

$51,686,589
$7,743,477

Year:

2025
2025

IR 77

PID #: 111405

County:

SUMMIT

Location:

BATH TWP

Description:

WIDEN TO 6 LANES FROM GHENT RD TO EVERETT RD

Project Sponsor:
Total Project Cost:

$76,658,059

Project Funding Details-
Phase:

C
C

Fund Type:

FED
STATE

Amount:

$61,716,220
$9,079,971

Year:

2025
2025

AIR QUALITY

PID #: 111429

County:

SUMMIT/PORTAGE/WAYNE

Location:

SUMMIT/PORTAGE/WAYNE

Description:

PROMOTION OF ACTIVITIES TO IMPROVE AIR QUALITY SUCH AS BIKING AND WALKING

Project Sponsor:
Total Project Cost:

$100,000

Project Funding Details-
Phase:

O

Fund Type:

CMAQ

Amount:

$100,000

Year:

2024

RIDESHARE

PID #: 111433

County:

SUMMIT/PORTAGE/WAYNE

Location:

SUMMIT/PORTAGE/WAYNE

Description:

PROMOTION OF CARPOOLING

Project Sponsor:
Total Project Cost:

$80,000

Project Funding Details-
Phase:

O

Fund Type:

CMAQ

Amount:

$80,000

Year:

2024

SR 59

PID #: 112026

County:

PORTAGE

Location:

KENT

Description:

RECONSTRUCT TO INCLUDE RAISED MEDIANS, BUS PULL-OFFS, NEW SEWERS, TWO ROUNDABOUTS, UPGRADE LIGHTING, AND REPLACE SIDEWALKS FROM WILLOW ST TO HORNING RD

Project Sponsor:
Total Project Cost:

$28,463,388

Project Funding Details-
Phase:

C
C
C
C
C
C
C

Fund Type:

CMAQ
TASA
FED
SAFETY-F
LOCAL
CRP
RAISE

Amount:

$5,301,065
$700,000
$500,000
$1,300,101
$6,658,277
$3,600,000
$5,250,000

Year:

2025
2025
2025
2025
2025
2025
2025

SR 261

PID #: 112716

County:

SUMMIT

Location:

AKRON

Description:

CORRIDOR IMPROVEMENTS FROM OLIVE ST TO RIVERSIDE DR

Project Sponsor:
Total Project Cost:

$13,612,581

Project Funding Details-
Phase:

C
C
C
C

Fund Type:

CMAQ
STBG
SAFETY-F
LOCAL

Amount:

$900,000
$6,000,000
$3,500,000
$3,212,581

Year:

2025
2025
2025
2025

HOPOCAN/NORTON/SNYDER

PID #: 112735

County:

SUMMIT

Location:

BARBERTON

Description:

RESURFACING HOPOCAN AVE FROM HILLDALE AVE TO 8TH ST, NORTON AVE FROM 17TH ST NW TO BARBER RD, SNYDER AVE FROM 2ND ST SW TO 5TH ST SE

Project Sponsor:
Total Project Cost:

$2,785,889

Project Funding Details-
Phase:

C
C

Fund Type:

STBG
LOCAL

Amount:

$1,602,334
$1,169,755

Year:

2024
2024

CLEVELAND MASSILLON SIDEWALKS

PID #: 112788

County:

SUMMIT

Location:

BATH TWP

Description:

SIDEWALK ON WEST SIDE OF ROADWAY FROM SR 18 TO SPRINGSIDE DR

Project Sponsor:
Total Project Cost:

$686,138

Project Funding Details-
Phase:

P
P
R
R
C
C

Fund Type:

TASA
LOCAL
TASA
LOCAL
TASA
LOCAL

Amount:

$56,536
$14,134
$60,000
$15,000
$340,000
$121,138

Year:

2024
2024
2024
2024
2024
2024

STOW BIKE & HIKE TRAIL

PID #: 113016

County:

SUMMIT

Location:

STOW/SILVER LAKE/CUYAHOGA FALLS

Description:

CONSTRUCT MULTI-USE TRAIL FROM SR 8 PEDESTRIAN BRIDGE TO SPRINGDALE RD

Project Sponsor:
Total Project Cost:

$1,017,600

Project Funding Details-
Phase:

C
C

Fund Type:

TASA
LOCAL

Amount:

$700,000
$280,000

Year:

2027
2027

HIGHLAND/VALLEY VIEW RD

PID #: 113161

County:

SUMMIT

Location:

MACEDONIA

Description:

INTERSECTION IMPROVEMENTS AT HIGHLAND AND VALLEY VIEW RD INTERSECTION

Project Sponsor:
Total Project Cost:

$2,788,267

Project Funding Details-
Phase:

R
R
R
C
C
C

Fund Type:

CMAQ
STBG
LOCAL
CMAQ
STBG
LOCAL

Amount:

$105,680
$64,000
$33,531
$1,703,131
$238,051
$643,874

Year:

2024
2024
2024
2025
2025
2025

RAVENNA/SHEPARD/BROADWAY

PID #: 113165

County:

SUMMIT

Location:

MACEDONIA/TWINSBURG

Description:

ADD RIGHT TURN LANES ON RAVENNA RD, ADD LEFT TURN LANE ON SHEPARD, SIDEWALKS AND SIGNAL IMPROVEMENTS AT INTERSECTION

Project Sponsor:
Total Project Cost:

$3,513,020

Project Funding Details-
Phase:

R
R
C
C
C

Fund Type:

CMAQ
LOCAL
CMAQ-A
CMAQ-N
LOCAL

Amount:

$116,996
$29,249
$1,252,292
$1,369,288
$655,394

Year:

2024
2024
2025
2025
2025

RAVENNA RD

PID #: 113175

County:

SUMMIT

Location:

TWINSBURG TWP/HUDSON

Description:

RESURFACING FROM OLD MILL RD TO PORTAGE COUNTY LINE

Project Sponsor:
Total Project Cost:

$1,016,290

Project Funding Details-
Phase:

C
C

Fund Type:

STBG
LOCAL

Amount:

$600,000
$402,790

Year:

2025
2025

IR 77/SR 8

PID #: 114865

County:

SUMMIT

Location:

AKRON

Description:

CORRIDOR IMPROVEMENTS ON MAINLINE, SERVICE ROADS AND RAMPS FROM JUST NORTH OF LOVERS LANE TO SR 8 AND SR 8 FROM I-77 TO JUST NORTH OF PERKINS ST.

Project Sponsor:
Total Project Cost:

$61,000,000

Project Funding Details-
Phase:

P
P

Fund Type:

FED
STATE

Amount:

$1,600,000
$400,000

Year:

2024
2024

CANTON RD

PID #: 115358

County:

SUMMIT

Location:

SPRINGFIELD TWP

Description:

RESURFACING FROM PONTIUS RD TO TISEN RD

Project Sponsor:
Total Project Cost:

$1,970,389

Project Funding Details-
Phase:

C
C

Fund Type:

STBG
LOCAL

Amount:

$528,000
$1,442,389

Year:

2024
2024

OLD FORGE RD

PID #: 115359

County:

PORTAGE

Location:

BRIMFIELD TWP

Description:

RESURFACING FROM SUNNYBROOK RD TO RANFIELD RD

Project Sponsor:
Total Project Cost:

$799,953

Project Funding Details-
Phase:

C
C

Fund Type:

STBG
LOCAL

Amount:

$628,362
$157,091

Year:

2027
2027

N CHESTNUT ST/ S PROSPECT ST

PID #: 115360

County:

PORTAGE

Location:

RAVENNA

Description:

RESURFACING CHESTNUT ST FROM SR 59 MAIN ST TO SR 14, RESURFACING S PROSPECT ST FROM THE SOUTH CORP LINE TO SR 59

Project Sponsor:
Total Project Cost:

$905,000

Project Funding Details-
Phase:

C
C

Fund Type:

STBG
LOCAL

Amount:

$751,500
$153,500

Year:

2024
2024

SPRINGSIDE DR

PID #: 116457

County:

SUMMIT

Location:

BATH TWP

Description:

INSTALL NEW SIDEWALK FROM SR 18 TO CLEVELAND MASSILLON RD

Project Sponsor:
Total Project Cost:

$1,047,654

Project Funding Details-
Phase:

P
P
R
R
C
C

Fund Type:

TASA
LOCAL
TASA
LOCAL
TASA
LOCAL

Amount:

$35,518
$8,879
$10,000
$30,559
$590,000
$292,095

Year:

2024
2024
2024
2024
2027
2027

RUBBER CITY HERITAGE TRAIL PH 2

PID #: 116464

County:

SUMMIT

Location:

AKRON

Description:

CONSTRUCT MULTI-USE TRAIL FROM HUNTINGTON AVE TO S ARLINGTON ST

Project Sponsor:
Total Project Cost:

$954,500

Project Funding Details-
Phase:

C
C

Fund Type:

TASA
LOCAL

Amount:

$700,000
$223,000

Year:

2025
2025

FROST RD PHASE 2

PID #: 116470

County:

PORTAGE

Location:

STREETSBORO

Description:

RESURFACING EAST OF SR 43 TO PAGE RD

Project Sponsor:
Total Project Cost:

$626,312

Project Funding Details-
Phase:

C
C
C

Fund Type:

FED
STBG
LOCAL

Amount:

$8,168
$522,942
$95,202

Year:

2024
2024
2024

HIGHLAND RD

PID #: 116479

County:

SUMMIT

Location:

TWINSBURG

Description:

RESURFACING FROM HADDEN RD TO DARROW RD

Project Sponsor:
Total Project Cost:

$591,800

Project Funding Details-
Phase:

STBG
LOCAL

Fund Type:

STBG
LOCAL

Amount:

$522,000
$58,000

Year:

2024
2024

GLENWOOD DR

PID #: 116505

County:

SUMMIT

Location:

TWINSBURG

Description:

RESURFACING FROM RAVENNA RD TO DARROW RD

Project Sponsor:
Total Project Cost:

$977,400

Project Funding Details-
Phase:

C
C

Fund Type:

STBG
LOCAL

Amount:

$787,500
$189,900

Year:

2027
2027

MILLER RD

PID #: 116539

County:

SUMMIT

Location:

AKRON/FAIRLAWN

Description:

RESURFACING FROM RIDGEWOOD RD TO W MARKET ST

Project Sponsor:
Total Project Cost:

$540,470

Project Funding Details-
Phase:

C
C

Fund Type:

STBG
LOCAL

Amount:

$409,500
$121,470

Year:

2024
2024

ALBRECHT AVE

PID #: 116556

County:

SUMMIT

Location:

SPRINGFIELD TWP/MOGADORE

Description:

RESURFACING FROM STULL AVE TO CLEVELAND AVE

Project Sponsor:
Total Project Cost:

$1,159,250

Project Funding Details-
Phase:

C
C

Fund Type:

STBG
LOCAL

Amount:

$787,500
$351,250

Year:

2027
2027

S MAIN ST

PID #: 116557

County:

SUMMIT

Location:

COVENTRY TWP

Description:

RESURFACING FROM GREEN NORTH CORP LIMIT TO WARNER RD

Project Sponsor:
Total Project Cost:

$1,663,629

Project Funding Details-
Phase:

C
C

Fund Type:

STBG
LOCAL

Amount:

$787,500
$855,629

Year:

2027
2027

GREENWICH RD

PID #: 116620

County:

SUMMIT

Location:

NORTON

Description:

RESURFACING FROM S MEDINA LINE RD TO CLEVELAND MASSILLON RD

Project Sponsor:
Total Project Cost:

$1,259,840

Project Funding Details-
Phase:

C
C

Fund Type:

STBG
LOCAL

Amount:

$787,500
$472,339

Year:

2027
2027

GRAHAM RD

PID #: 116623

County:

SUMMIT

Location:

STOW

Description:

RESURFACING EAST OF SR 91 TO NEWCOMER RD

Project Sponsor:
Total Project Cost:

$994,175

Project Funding Details-
Phase:

C
C

Fund Type:

STBG
LOCAL

Amount:

$787,500
$190,575

Year:

2027
2027

VALLEY VIEW RD

PID #: 116703

County:

SUMMIT

Location:

SAGAMORE HILLS TWP

Description:

RESURFACING FROM DUNHAM RD TO OLDE EIGHT RD

Project Sponsor:
Total Project Cost:

$1,522,225

Project Funding Details-
Phase:

C
C

Fund Type:

STBG
LOCAL

Amount:

$787,500
$734,725

Year:

2027
2027

BAILEY RD

PID #: 116740

County:

SUMMIT

Location:

CUYAHOGA FALLS

Description:

RESURFACING FRONT ST TO GRAHAM RD

Project Sponsor:
Total Project Cost:

$890,800

Project Funding Details-
Phase:

C
C

Fund Type:

STBG
LOCAL

Amount:

$700,000
$175,000

Year:

2027
2027

HUDSON DR

PID #: 116741

County:

SUMMIT

Location:

CUYAHOGA FALLS

Description:

RESURFACING FROM FRONT ST TO GRAHAM RD

Project Sponsor:
Total Project Cost:

$1,026,531

Project Funding Details-
Phase:

C
C

Fund Type:

STBG
LOCAL

Amount:

$700,000
$310,831

Year:

2027
2027

WYOGA LAKE RD

PID #: 116742

County:

SUMMIT

Location:

CUYAHOGA FALLS

Description:

ADD TWO WAY LEFT TURN LANE, ADD RIGHT TURN LANES WHERE WARRANTED, ADD A NEW SIGNAL AT WALSH HS MAIN ENTRANCE FROM STEELS CORNERS RD TO SEASONS RD

Project Sponsor:
Total Project Cost:

$7,736,000

Project Funding Details-
Phase:

R
R
C
C

Fund Type:

STBG
LOCAL
STBG
LOCAL

Amount:

$200,000
$50,000
$5,900,000
$1,350,000

Year:

2025
2025
2026
2026

HEARTLAND TRAIL PH 4A

PID #: 116841

County:

WAYNE

Location:

CHIPPEWA TWP

Description:

CONSTRUCT MULTI-USE TRAIL FROM NORTH OF MARKET ST TO COAL BANK RD

Project Sponsor:
Total Project Cost:

$819,703

Project Funding Details-
Phase:

P
P
C
C

Fund Type:

TASA
LOCAL
TASA
LOCAL

Amount:

$14,071
$3,518
$590,583
$147,646

Year:

2024
2024
2026
2026

VETERANS RAILS TO TRAILS

PID #: 116868

County:

SUMMIT

Location:

HUDSON

Description:

CONSTRUCT MULTI-USE TRAIL FROM SPRINGDALE RD TO BARLOW RD

Project Sponsor:
Total Project Cost:

$2,382,800

Project Funding Details-
Phase:

C
C

Fund Type:

TASA
LOCAL

Amount:

$700,000
$1,600,000

Year:

2027
2027

S ARLINGTON RD

PID #: 116917

County:

SUMMIT

Location:

GREEN

Description:

WIDEN TO FOUR LANES, NEW ROUNDABOUTS AT BOETTLER RD AND SOUTHWOOD DR, NEW SIDEWALKS FROM SOUTH OF BOETTLER RD TO NORTH OF SEPTEMBER DR

Project Sponsor:
Total Project Cost:

$18,148,352

Project Funding Details-
Phase:

R
R
R
C
C
C
C

Fund Type:

CMAQ
STBG
LOCAL
CMAQ
STBG
LOCAL
FED-DIS

Amount:

$762,124
$674,602
$359,182
$3,305,666
$1,699,040
$9,233,339
$2,000,000

Year:

2025
2025
2025
2026
2026
2026
2026

HUDSON SIGNALS

PID #: 116924

County:

SUMMIT

Location:

HUDSON

Description:

UPGRADE 14 SIGNALS TO ADAPTIVE “SMART” SIGNALS ON SR 91 AND SR 303

Project Sponsor:
Total Project Cost:

$2,678,076

Project Funding Details-
Phase:

C
C

Fund Type:

CMAQ
LOCAL

Amount:

$2,142,461
$535,615

Year:

2024
2024

BARLOW RD

PID #: 116925

County:

SUMMIT

Location:

HUDSON

Description:

RESURFACING FROM NORFOLK SOUTHERN RAILROAD TO STOW RD

Project Sponsor:
Total Project Cost:

$497,504

Project Funding Details-
Phase:

C
C

Fund Type:

STBG
LOCAL

Amount:

$439,744
$48,860

Year:

2027
2027

SR 91/TEREX RD INTERSECTION

PID #: 116929

County:

SUMMIT

Location:

HUDSON

Description:

INTERSECTION IMPROVEMENTS TO IMPROVE LEFT TURN OFFSETS, EXTEND EASTBOUND LEFT TURN LANE AND ADD NEW WESTBOUND TURN LANE INTO JOANN FABRICS ENTRANCE

Project Sponsor:
Total Project Cost:

$570,002

Project Funding Details-
Phase:

C
C

Fund Type:

STBG
LOCAL

Amount:

$400,142
$154,960

Year:

2026
2026

VALLEY VIEW RD

PID #: 116932

County:

SUMMIT

Location:

HUDSON

Description:

RESURFACING FROM HUDSON NORTH CORP LIMIT TO SR 91

Project Sponsor:
Total Project Cost:

$974,170

Project Funding Details-
Phase:

C
C

Fund Type:

STBG
LOCAL

Amount:

$787,500
$169,970

Year:

2024
2024

CLEVELAND/DIAGONAL/RAVENNA

PID #: 116939

County:

PORTAGE

Location:

RAVENNA
FRANKLIN TWPS

Description:

RESURFACING CLEVELAND RD FROM RAVENNA NORTH CORP LIMIT TO SR 14, RESURFACING RAVENNA RD FROM BRADY LAKE RD TO SR 43, RESURFACING DIAGONAL RD FROM SR 43 TO RAVENNA RD

Project Sponsor:
Total Project Cost:

$1,173,157

Project Funding Details-
Phase:

C
C

Fund Type:

STBG
LOCAL

Amount:

$935,966
$215,992

Year:

2027
2027

SR 59 SIGNALS

PID #: 116990

County:

SUMMIT

Location:

STOW

Description:

SIGNAL UPGRADES FROM SYCAMORE DR TO FISHCREEK RD

Project Sponsor:
Total Project Cost:

$1,953,281

Project Funding Details-
Phase:

C
C

Fund Type:

CMAQ
LOCAL

Amount:

$1,520,145
$380,036

Year:

2025
2025

S MAIN ST

PID #: 117105

County:

SUMMIT

Location:

GREEN

Description:

RESURFACING SOUTH OF WEST CASTON RD TO SR 619

Project Sponsor:
Total Project Cost:

$1,481,939

Project Funding Details-
Phase:

C
C

Fund Type:

STBG
LOCAL

Amount:

$787,500
$694,439

Year:

2024
2024

CLEVELAND MASSILLON RD PH 3

PID #: 117138

County:

SUMMIT

Location:

NEW FRANKLIN

Description:

RESURFACING FROM SERFASS RD TO GRILL RD

Project Sponsor:
Total Project Cost:

$993,236

Project Funding Details-
Phase:

C
C

Fund Type:

STBG
LOCAL

Amount:

$700,000
$275,336

Year:

2027
2027

N MAIN ST

PID #: 117631

County:

WAYNE

Location:

RITTMAN

Description:

RESURFACING FROM OHIO AVE TO RITTMAN NORTH CORP LIMIT

Project Sponsor:
Total Project Cost:

$444,735

Project Funding Details-
Phase:

C
C

Fund Type:

STBG
LOCAL

Amount:

$400,262
$44,474

Year:

2027
2027

AIR QUALITY

PID #: 118654

County:

SUMMIT/PORTAGE/WAYNE

Location:

SUMMIT/PORTAGE/WAYNE

Description:

PROMOTION OF ACTIVITIES TO IMPROVE AIR QUALITY SUCH AS BIKING AND WALKING

Project Sponsor:
Total Project Cost:

$100,000

Project Funding Details-
Phase:

O

Fund Type:

CMAQ

Amount:

$100,000

Year:

2025

AIR QUALITY

PID #: 118655

County:

SUMMIT/PORTAGE/WAYNE

Location:

SUMMIT/PORTAGE/WAYNE

Description:

PROMOTION OF ACTIVITIES TO IMPROVE AIR QUALITY SUCH AS BIKING AND WALKING

Project Sponsor:
Total Project Cost:

$100,000

Project Funding Details-
Phase:

O

Fund Type:

CMAQ

Amount:

$100,000

Year:

2026

AIR QUALITY

PID #: 118656

County:

SUMMIT/PORTAGE/WAYNE

Location:

SUMMIT/PORTAGE/WAYNE

Description:

PROMOTION OF ACTIVITIES TO IMPROVE AIR QUALITY SUCH AS BIKING AND WALKING

Project Sponsor:
Total Project Cost:

$100,000

Project Funding Details-
Phase:

O

Fund Type:

CMAQ

Amount:

$100,000

Year:

2027

RIDESHARE

PID #: 118657

County:

SUMMIT/PORTAGE/WAYNE

Location:

SUMMIT/PORTAGE/WAYNE

Description:

PROMOTION OF CARPOOLING

Project Sponsor:
Total Project Cost:

$80,000

Project Funding Details-
Phase:

O

Fund Type:

CMAQ

Amount:

$80,000

Year:

2025

RIDESHARE

PID #: 118658

County:

SUMMIT/PORTAGE/WAYNE

Location:

SUMMIT/PORTAGE/WAYNE

Description:

PROMOTION OF CARPOOLING

Project Sponsor:
Total Project Cost:

$80,000

Project Funding Details-
Phase:

O

Fund Type:

CMAQ

Amount:

$80,000

Year:

2026

RIDESHARE

PID #: 118659

County:

SUMMIT/PORTAGE/WAYNE

Location:

SUMMIT/PORTAGE/WAYNE

Description:

PROMOTION OF CARPOOLING

Project Sponsor:
Total Project Cost:

$80,000

Project Funding Details-
Phase:

O

Fund Type:

CMAQ

Amount:

$80,000

Year:

2027

SR 8

PID #: 76721

County:

SUMMIT

Location:

STOW/HUDSON

Description:

RECONSTRUCTION FROM GRAHAM RD TO NORTH OF SR 303

Project Sponsor:
Total Project Cost:

$67,725,190

Project Funding Details-
Phase:

O
O
O
O

Fund Type:

GARVEE
GARVEE
GARVEE
GARVEE

Amount:

$4,764,213
$4,764,214
$4,764,214
$4,764,214

Year:

2024
2025
2026
2027

IR 76

PID #: 93501

County:

SUMMIT

Location:

NORTON/BARBERTON

Description:

RESURFACING FROM MEDINA COUNTY LINE TO SR 21, WIDENING TO 6 LANES FROM SR 21 TO CENTRAL AVE

Project Sponsor:
Total Project Cost:

$89,048,328

Project Funding Details-
Phase:

O
O
O
O

Fund Type:

GARVEE
GARVEE
GARVEE
GARVEE

Amount:

$9,082,587
$8,918,038
$8,075,717
$2,285,755

Year:

2024
2025
2026
2027

IR 76

PID #: 96670

County:

SUMMIT

Location:

BARBERTON/AKRON

Description:

WIDEN TO 6 LANES AND RECONFIGURE WOOSTER RD /EAST AVE/STATE ST INTERCHANGES FROM CENTRAL AVE TO 27TH ST

Project Sponsor:
Total Project Cost:

$37,585,338

Project Funding Details-
Phase:

O
O
O
O

Fund Type:

GARVEE
GARVEE
GARVEE
GARVEE

Amount:

$2,280,740
$2,280,741
$2,280,740
$2,280,740

Year:

2024
2025
2026
2027